CASE STUDIES

Metal & Steel Decking, Reinforced Concrete, Safety Netting and Air Mats

Over the past 28 years we have completed hundreds of thousands of square metres of installations in reinforced concrete, steel and metal decking. Many projects we do get photos and case study write-ups but time is sometimes limited and privacy obtained on request. We shall try and update our case studies each year. Prodeck-Fixing Ltd has been involved in many of the UK’s largest construction projects.

residential construction decking concrete

GOLF RESIDENTIAL – BATH

Golf Course Road is a residential property over three storeys and situated in the heart of Bath. The large open plan design called for ComFlor 225 decking, which has the capability of spanning up to 6.5m unpropped. Using CF225, the architects were able to offer open plan living space, with minimal steel columns.

Case Study Residential
WESTON PIER STEEL CONCRETE CONSTRUCTION

WESTON-SUPER-MARE – PIER

Victorian Building Weston Grand Pier is a historical and iconic landmark of Britain. Sadly burnt down in 2008 and re-developed to a new modern structure. Re-designed grand Pier is laid out over two main floors, comprising world class amusement rides and attractions, with a third floor comprising function rooms, offices, event and conferencing space.

Case Study WSM Pier
William Wallbrook London

WILLIAM HARE – WALLBROOK

A major construction project by any standard, Bloomberg features over 77,000m² of TATA Comflor 51+, TATA Comflor 60 and TATA Comflor 80 over nine floors. The development of the building comprises two office buildings, ground floor retail units and a new entrance to the London Underground.

Case Study WHW
roof floor decking

ATHERTON LEISURE CENTRE

Atherton Leisure Centre is a re-development, demolishing the existing structure, and replacing it with a modern and accessible centre. The project consists of a 25m main swimming pool, a 20m pool, gym and fitness studios, crèche, play area and café. Atherton Leisure Centre will also feature the latest combined heat and power system, turning waste heat into electricity to power the centre.

The project required the need for four different metal decking profiles. By offering a wide range of composite floor and roof decking systems, Prodeck-Fixing were able to meet all of the roofing and flooring requirements for Atherton Leisure Centre.

A consideration for our in house design team was how to integrate the different deck types together to create a continuous area, and minimise concrete loss.

Case Study Atherton